Sign In | Join Free | My ccnmag.com |
|
Brand Name : USEUMETAL
Model Number : USEU-2
Place of Origin : China
span : 20m-60m
anti-corrosion treatment : Hot-dip Galvanizing
surface treatment : Painting
deck height : 1.2m
warranty : 12 Months
material : Steel
clearance : 3.6m
bearing capacity : 50T
Steel Bailey Bridge is a kind of truss overpass bridge made of steel. It is also known as steel Bailey truss arch bridge. The bridge adopts hot-dip galvanizing for anti-corrosion treatment and its deck width is 3.05m. It has a bearing capacity of 50T and provides 12-month warranty. It is an ideal choice for medium-span bridge, and can be used as the main bridge, emergency bridge, or temporary bridge. The whole steel Bailey bridge is pre-assembled before shipment, and the installation is simple and fast.
Parameters | Details |
---|---|
Type | Bailey Bridge |
Material | Steel |
Bearing Type | Pin-connected |
Deck Width | 3.05m |
Clearance | 3.6m |
Bearing Capacity | 50T |
Service Life | 50 Years |
Installation | Bolt Connection |
Anti-corrosion Treatment | Hot-dip Galvanizing |
Surface Treatment | Painting |
USEUMETAL is a leading manufacturer of Steel Bailey Bridge. The Steel Bailey Bridge is designed to USEU-2 with a 12 month warranty. It has a pin-connected bearing type, and the anti-corrosion treatment is hot-dip galvanizing to ensure durability and long-term performance. The bearing capacity of the Steel Bailey Bridge is up to 50T, making it an ideal choice for various applications, including Steel-Bailey-Truss-Arch-Bridge, Steel-Bailey-Arch-Bridge, Steel-Bailey-Truss-Overpass-Bridge, and more. The Steel Bailey Bridge is a strong, reliable, and cost-effective solution for a variety of bridge-building projects.
We offer customized services for Steel-Bailey-Overpass-Bridge, Steel-Bailey-Span-Bridge and Steel-Bailey-Overpass-Bridge-Installation. Our Steel Bailey Bridge is brand named USEUMETAL, model number USEU-2, and originated from China. It has a service life of 50 years, and the installation is done by bolt connection. The deck height is 1.2m, and the surface treatment is painting. The span is adjustable from 20m to 60m.
Steel Bailey bridge technical support and service
We provide comprehensive technical support and service for the Steel Bailey Bridge. Our team of experienced engineers is available to provide technical advice and assistance to help ensure that the bridge is properly installed and maintained. We also provide regular maintenance and inspection services to ensure the bridge remains in good condition and can be safely used. We also provide replacement parts and components when needed. In addition, we provide training for bridge operators and maintainers to ensure they understand the importance of proper bridge maintenance and safety.
Steel Bailey Bridge Packaging and Shipping:
![]() |
Construction Solution Steel Bailey Bridge With 50 Year Service Life Images |